San Antonio, Texas
This tilt-wall and precast structure houses a single tenant (Fortune 100 client) with 18 MW of critical load, totaling 188,617 SF. With a 7 1/2-month schedule, this ground-up project was completed on time from start to a fully commissioned data center with four months of around-the-clock construction.
This two-story building includes:
To reduce noise to an adjacent residential neighborhood and two separate utility yards, 30-foot-tall sound barrier walls were installed on the entire west side of the project site. These walls consisted of poured-in-place concrete, tilt panels and precast at various areas of the building to remain within the sound ordinance levels.